The smallest room on the project fails the most inspections

man in black jacket standing in front of red and blue intermodal containers

The car can run perfectly and the job still will not close, because the machine room is storing paint cans, the room runs hot, the door is not rated, or there is not enough clearance in front of the controller. None of that is elevator work, and all of it stops the final. RiseWise brings the room to current code as part of the building scope: foreign systems removed or properly enclosed, a rated self-closing door, cooling sized to hold the new controller's operating range, and lighting, outlets, and clearances to spec.

a crane is on top of a large stack of containers

Bringing the room to current code

THE ROOM ITSELF

Foreign systems, storage, and enclosures

Removal or code-compliant enclosure of non-elevator piping, ductwork, and equipment, and clearing of storage that has accumulated in the room. Where a system cannot be relocated, we build the enclosure that lets it stay.

brown and red shipping containers

DOOR AND ENVELOPE

Rated, self-closing, and labeled

Fire-rated, self-closing, self-latching machine room doors with the correct hardware and signage, plus repair of the surrounding rated assembly. This is one of the most commonly written-up items in the room.

a crane is lifting a container onto a truck

ENVIRONMENT

Temperature, lighting, and clearances

HVAC sized to hold the temperature and humidity range the controller manufacturer requires, plus lighting levels, GFCI outlets, and working clearances to current code. Modern controllers are far less tolerant of heat than the equipment they replace.

red blue and white intermodal containers
  • MOVING GOODS

  • MOVING INDUSTRIES

  • LOGISTIC BUILT ON PRECISION

  • SMART ROUTES

The codes this scope answers to

Machine room requirements come from the elevator code, the electrical code, and the manufacturer's own installation requirements at once. We reconcile all three before pricing.

ASME A17.1

Machine room construction, access, and clearance requirements

NFPA 70

National Electrical Code, Article 620 for elevator work

OEM SPEC

Controller manufacturer's stated temperature and humidity range