New controllers need building power the old equipment never asked for

man carrying cardboard boxes during daytime

Building-side electrical is the single most commonly assumed scope on a modernization. Everyone believes it is in the elevator contract until the inspector asks who pulled the permit, and by then the equipment is on site. RiseWise settles that question at the survey, in writing. Disconnects, shunt trip coordination, GFCI protection, feeder and service work, and emergency power tie-ins are priced as building scope from the start, and installed by licensed electricians on the modernization schedule.

man in blue crew neck t-shirt standing beside brown cardboard boxes

Power to the equipment, to code

SERVICE AND DISCONNECT

Feeders, disconnects, and lockout

Fused, lockable main line disconnects in the required location, plus feeder and service work sized for the new equipment. Where the existing service will not carry the modernized load, we identify it at survey rather than at startup.

3 men in black polo shirt standing beside brown cardboard boxes

SPRINKLER INTERFACE

Shunt trip and coordination

Shunt trip breakers and coordination where sprinklers are present in the hoistway or machine room, wired and tested with the fire alarm scope so the two systems are commissioned together instead of blaming each other.

man standing in front of DHL truck door

EMERGENCY POWER

Generator and transfer equipment

Generator and automatic transfer tie-ins where emergency operation is required, including the signaling the controller needs to know it is on emergency power. Requirements vary by building type and number of landings, so we verify per project.

brown cardboard boxes on brown cardboard box
  • MOVING GOODS

  • MOVING INDUSTRIES

  • LOGISTIC BUILT ON PRECISION

  • SMART ROUTES

The codes this scope answers to

Elevator electrical has its own article in the electrical code, and it interacts with the fire and elevator codes at nearly every point. That intersection is where jobs get delayed.

NFPA 70

National Electrical Code, Article 620, elevators and related equipment

ASME A17.1

Elevator code requirements for power, disconnects, and emergency operation

NFPA 72

National Fire Alarm and Signaling Code, where shunt trip and recall intersect