Himon Logo
Himon Logo

OUR SERVICES

THE BUILDING SIDE OF EVERY MODERNIZATION, UNDER ONE CONTRACT

01

Hoistway & Fire-Rating

02

Machine Room Compliance

03

Electrical & Emergency Power

04

Fire Alarm & Life Safety

05

Structural, Mechanical & Finish

a truck driving down the road in the desert

Fire-rated walls, sealed penetrations, patching, bevels, and code-current landing lighting on long rises. The shaft passes before the car does.

01

Hoistway & Fire-Rating

Fire-rated walls, sealed penetrations, patching, bevels, and code-current landing lighting on long rises. The shaft passes before the car does.

a truck driving down the road in the desert

02

Machine Room Compliance

Non-elevator systems out or properly enclosed, fire-rated self-closing doors, HVAC that holds controller temperature, lighting and clearances the inspector actually measures.

blue and red cargo containers

03

Electrical & Emergency Power

Fused lockable disconnects, shunt trip, GFCI protection, feeder work, and generator or ATS tie-ins sized for the new controller.

containers vans

04

Fire Alarm & Life Safety

Detection in the machine room and hoistway, recall wiring to the new controller, sprinkler coordination, and an alarm interface tested before the AHJ ever sees it.

aerial view of vehicles in parking area

05

Structural, Mechanical & Finish

Pit work, cutting and patching, doors and frames, mechanical modifications, and the finish repairs that leave the building looking untouched.

man in green and yellow striped shirt holding black smartphone

01

Hoistway & Fire-Rating

Fire-rated walls, sealed penetrations, patching, bevels, and code-current landing lighting on long rises. The shaft passes before the car does.

a truck driving down the road in the desert

02

Machine Room Compliance

Non-elevator systems out or properly enclosed, fire-rated self-closing doors, HVAC that holds controller temperature, lighting and clearances the inspector actually measures.

blue and red cargo containers

03

Electrical & Emergency Power

Fused lockable disconnects, shunt trip, GFCI protection, feeder work, and generator or ATS tie-ins sized for the new controller.

containers vans

04

Fire Alarm & Life Safety

Detection in the machine room and hoistway, recall wiring to the new controller, sprinkler coordination, and an alarm interface tested before the AHJ ever sees it.

aerial view of vehicles in parking area

05

Structural, Mechanical & Finish

Pit work, cutting and patching, doors and frames, mechanical modifications, and the finish repairs that leave the building looking untouched.

man in green and yellow striped shirt holding black smartphone

The elevator gets modernized in weeks. The building around it is what decides whether the job passes. We take that scope whole.

One Contract

Every building-side trade under a single agreement and a single point of accountability, from the first walk to final sign-off.

One Contract

Every building-side trade under a single agreement and a single point of accountability, from the first walk to final sign-off.

One Schedule

We sequence every trade against your install date instead of around it, so the building is ready when the mechanics mobilize.

One Schedule

We sequence every trade against your install date instead of around it, so the building is ready when the mechanics mobilize.

Priced in Days

An itemized proposal from a real site walk, formatted for your customer file, while your bid is still live.

Priced in Days

An itemized proposal from a real site walk, formatted for your customer file, while your bid is still live.

Built to Pass

Code checked at survey, verified at rough-in, proven at final. We schedule the inspection because we expect to pass it.

Built to Pass

Code checked at survey, verified at rough-in, proven at final. We schedule the inspection because we expect to pass it.